D701 Blue Black 3.5 Litre

D701 Blue Black 3.5 Litre

DELTRON

  • $476.62
    Unit price per 
Shipping calculated at checkout.


Deltron DG is a high-performance two-pack acrylic urethane topcoat designed for the direct gloss repair and respray of all motor vehicles. The performance of Deltron DG in a recommended PPG repair system meets or exceeds motor manufacturer warranty requirements and the Deltron system carries many OEM approvals.

Deltron Direct Gloss Tinters D7xx 
Deltron Hardeners DH710, DH720, DH730 
Deltron Thinners DT810, DT820, DT830, DT840 
Deltron Accelerator DT850 
Deltron Fade-out Thinner DT880 
For painting of very flexible substrates: Deltron Flexibilser DA210
To obtain matt finishes it is recommended that D8115 and D8117 are used 

Preparation of Substrate:
PPG 2K primers - P600 wet / P400 dry
Electrocoat - Pre-prime; Do not topcoat direct
Sound 2K finishes - P600 wet / P400 dry
TPA - Must be sealed (e.g. D834)

Before and after any sanding operation, the substrate must be thoroughly degreased using D845 or D837. Use D837 only prior to any painting.

Application Guide:

MS System Accelerated System
DG 2 vols DG 2 vols
Hardener** 1 vol Hardener 1 vol
Thinner* 0.5 vol Thinner 0.5 vol

** Choose MS Hardener and Thinner according to application temperature and the size of the area being painted 

MS System Accelerated System
MS Hardener Thinner Hardener Thinner
Up to 18'C DH710 DT810 DHXXX DT850
18'C - 25'C DH720 DT820
Over 25'C DH730 DT830

For exceptional conditions of temperature and humidity (>35'C and >70%) the use of Extra Slow Thinner DT840 is recommended.

Potlife: 

MS System Accelerated System
3 hours at 25'C 1 hour at 25'C


Spray Viscosity: 19 - 22 secs DIN4 at 25'C

Spraygun Setup: 1.3 - 1.4mm or equivalent

Spray Pressure:

HVLP / RP Conventional
2-3 bar 45 - 55 PSI / 300 - 380 KPA


Number of Coats: 1 normal, 1-2 full

Flash Off at 25'C:

MS System Accelerated System
Between Coats 5-10 minutes 3-5 minutes
Before Stoving Bake immediately Bake immediately

 
Drying Times:

MS System Accelerated System
Dust-Free 30 minutes 10 minutes
20'C Dry to Handle 4 hours minimum 3 hours
Through-Dry 20'C 20 hours 5 hours
Through-Dry 60'C 30 minutes 20 minutes*
IR Medium 10-15 minutes depending on colour 10-15 minutes depending on colour

*Bake times are for quoted metal temperature. Additional time should be allowed in the baking schedule to allow metal to reach recommended temperature.

Total Dry Film Build: 
Minimum 50 um
Maximum 60 um 

Theoretical Coverage* 6 –7 m²/L 
* Theoretical coverage in m2/L ready-to-spray, giving 50 um dry film thickness. 

Flash Points: 
DG Colour, DH Hardeners - See PPG MSDS 
DT Thinners - See PPG MSDS

Sanding: 
Essential before recoating to ensure good adhesion
Grade wet P600
Grade dry P400 

Overcoat/Recoat Time: 
After surface has cooled if baked, or after 8 hours minimum at 25'C. 
Recoat times will be extended at lower temperatures.

Overcoat with Deltron Primers or Deltron topcoat.